Minnesota Rules & Liability

Minneapolis Sidewalk Snow Removal Rules for Businesses and Apartments

9 min read Updated  By the East Metro Snow Removal team

Quick answer

In Minneapolis, businesses, apartment buildings and every property other than a single-family home or duplex must clear public sidewalks within 4 daytime hours (8 a.m. to 5 p.m.) after it stops snowing. Clear the full width down to bare pavement along the whole property, sand ice you can't remove, and on corners clear curb cutouts and crosswalks to the gutter. If you don't, the City can clear the walk and bill you.

Key takeaways

  • Businesses and apartments get 4 daytime hours after snow stops, and the City defines daytime as 8 a.m. to 5 p.m. Homes and duplexes get 24 hours.
  • Clear the full sidewalk width to bare pavement along your entire frontage, and sand ice you can't remove until it can be cleared.
  • Corner properties must open curb cutouts and crosswalks to the street gutter. Plow piles beyond the gutter are the City's job.
  • City crews can clear an uncleared walk and bill the owner, and unpaid bills are added to property taxes.
  • Write the deadline into your contract as a completion time tied to when snow stops, with return visits after City plows pass.
In this guide
  1. How long do businesses have to clear sidewalks in Minneapolis?
  2. What does a cleared sidewalk mean in Minneapolis?
  3. What are the rules for corner properties, curb ramps and crosswalks?
  4. What happens if a Minneapolis sidewalk isn't cleared?
  5. Who is responsible: the owner, a tenant or the contractor?
  6. How to write a sidewalk spec that meets the 4-hour window
  7. Minneapolis sidewalk compliance checklist
  8. Frequently asked questions

How long do businesses have to clear sidewalks in Minneapolis?

Four daytime hours after it stops snowing. The City's sidewalk rules say every property other than a single-family home or duplex, including businesses and apartment buildings, must clear public sidewalks within 4 daytime hours, which the City defines as 8 a.m. to 5 p.m. Single-family homes and duplexes get 24 hours. The City's page cites Minneapolis Ordinance 445.20.

That's one of the tightest sidewalk deadlines in the Twin Cities. St. Paul, by comparison, gives every property 24 hours; see our guide to St. Paul sidewalk snow rules.

The "daytime" wording matters for planning. Read plainly, only hours between 8 a.m. and 5 p.m. count toward the four, so a storm that ends overnight gives you until about noon, and one that ends late in the afternoon carries over to the next morning. The City hasn't published worked examples, so treat this table as a planning guide, build in margin, and ask 311 if a deadline is close.

Snow stops at4 daytime hours run out (plain reading)Practical target for a business
2 a.m.Noon the same dayWalks clear before opening, often 6–7 a.m.
7 a.m.Noon the same dayEntrances first, full frontage by mid-morning
10 a.m.2 p.m. the same dayClear by noon; recheck before evening traffic
3 p.m.10 a.m. the next day (2 hours that day, 2 the next)Clear the same evening so slush doesn't freeze overnight
9 p.m.Noon the next dayClear overnight with the lot, before opening

Two cautions. First, the legal deadline is a floor, not a service level. Customers, tenants and staff start arriving around 7 a.m., and a sidewalk that's legal until noon can still be where someone falls; see our guide to Minnesota snow and ice liability. Second, the deadline runs from when it stops snowing, so a storm that pauses and restarts usually means more than one pass. Plan for a final clearing after the last of it.

What does a cleared sidewalk mean in Minneapolis?

A cleared Minneapolis sidewalk is open across its full width, down to bare pavement, along the entire property. The City's rules spell out the specifics, and each one translates into a line in your snow scope.

RequirementWhat the City saysHow to write it into your scope
WidthShovel the entire width of the City sidewalk on your entire propertyList frontage by street, in linear feet, from building or lot line to curb
SurfaceDown to bare pavementRequire full removal, not a single blower pass that leaves a packed layer
IceIf snow is packed or there's ice you can't remove, sprinkle sand until it's warm enough to remove; clearing or sanding ice that forms is your responsibilityInclude ice checks and treatment after melt and refreeze, not just after snowfall
Where snow goesInto your yard or boulevard; it's against the law to shovel snow into streets or alleysMark boulevard and on-site stack areas; ban blowing snow into the street
Bus stopsNext to an unsheltered bus stop, clear a path from the sidewalk to the streetMap every bus stop along the frontage
CornersClear curb cutouts at street corners and crosswalks to the street gutterList every corner ramp by location

Sand is what the City's sidewalk page names for ice, and its special assessment guide mentions sand or salt on icy sidewalks. Many commercial sites use deicers on walks. If you do, shovel first, apply sparingly, and match the product to pavement temperature, since plain rock salt slows sharply below about 15°F. Our guide to smart salting in Minnesota explains why over-application damages concrete and water quality without adding safety.

If you'll be away, the City says to arrange for someone else to shovel. For a business, that someone should be a contractor with a written scope, not an employee who may or may not make it in on a snow day.

What are the rules for corner properties, curb ramps and crosswalks?

If your property is on a corner, your job extends past the sidewalk to the curb cutouts (curb ramps) and the crosswalks out to the street gutter. You don't have to clear piles a plow left beyond the gutter. The City says you can if it's safe, and that its crews will handle them as soon as possible.

Corner commercial lots are where most sidewalk compliance fails, for three reasons:

  • More frontage than people think. A corner building has two street frontages, and a full-block site can have four. Measure each in linear feet. A contractor who prices "the sidewalk" may have counted only the side with the front door.
  • Ramps get reburied. The City plow's windrow often lands right in the curb cutout. A ramp cleared at 6 a.m. can be blocked again at 10 a.m. when the street is plowed. A scope that only says "clear once after snowfall" leaves that gap open.
  • Ramps are accessibility features. A blocked curb ramp cuts off people using wheelchairs, walkers or strollers from the crossing. Our guide to ADA accessible routes in winter covers the full accessible route from the street and parking to your entrance.

The practical fix has two parts. First, list every corner on the site map by location, such as "NE corner ramp, 1st Ave. and 5th St." Second, add a return-visit clause: after the City plows an adjacent street, the contractor reopens every listed ramp and crosswalk to the gutter within a set number of hours. During a Snow Emergency that can mean one visit per plow phase; see our guide to Minneapolis Snow Emergency rules for the timing.

What happens if a Minneapolis sidewalk isn't cleared?

The City can clear it and bill the property owner, and an unpaid bill is added to property taxes. Enforcement runs through inspections and complaints:

  1. Reports and inspections. Anyone can report an unshoveled sidewalk online or by calling 311 (612-673-3000 from outside the city). The City also inspects on its own and says it starts inspecting sidewalks 24 hours after each snowfall.
  2. Notice. The City's snow FAQ says owners who don't properly clear a sidewalk may receive a letter telling them to do so.
  3. Follow-up inspection. If the sidewalk still isn't clear at the follow-up inspection, crews remove the snow and ice. The City's assessment guide describes this work as done by a City-hired contractor.
  4. Billing. The owner is billed for the work. If the bill isn't paid, the City adds it to the property taxes.

The City's special assessment guide prices commercial clearing above single-family rates and adds an administrative fee per violation. Rates change, so ask 311 for current figures rather than relying on an old flyer.

The City bill is usually the smaller risk. An uncleared walk outside a business is also a premises-liability problem, and a 311 complaint or inspection record can surface later in a claim. Keep your own time-stamped service records so you can show when the walk was cleared and treated. Our guide to snow removal documentation shows what to log.

Who is responsible: the owner, a tenant or the contractor?

The City looks to the property owner. Its sidewalk materials say clearing public sidewalks is the responsibility of the adjacent property owner, and City clearing charges are billed to the owner and, if unpaid, assessed against the property.

Leases and contracts can move the work, but not the City's bill:

  • Single-tenant buildings. Net leases often make the tenant responsible for snow. The owner is still who the City bills, so require proof the tenant has a contractor in place, and keep the right to step in and charge back.
  • Multi-tenant retail and office. The landlord usually controls the common sidewalks and recovers the cost through common area maintenance (CAM) charges. One contractor covering the whole frontage avoids gaps between storefronts.
  • Apartments. Owners and their management companies typically handle public sidewalks, entrances and lots as common areas.
  • Contractors. A contractor answers to you under its contract, not to the City. If the contract doesn't spell out the 4-hour window, there may be nothing to enforce.

Our guide to whether commercial tenants are responsible for snow removal covers lease language and the disputes that come up most.

How to write a sidewalk spec that meets the 4-hour window

Write the sidewalk scope as its own section of the snow contract, with a completion time tied to when snow stops rather than a vague "as needed." A good spec covers seven points:

  1. Map and measurements. Every public sidewalk segment by street, in linear feet, plus corner ramps, crosswalks, bus stops and building entrances.
  2. Trigger. Sidewalks usually need a lower trigger depth (the snowfall that starts service) than the lot, such as any measurable snow or 1 inch; see our guide to snow trigger depths and service levels.
  3. During-storm passes. For longer or deeper storms, require walks to be kept passable during business hours, not just cleared at the end.
  4. Completion window. Require walks clear to bare pavement within a set time after snow stops, short enough to stay inside 4 daytime hours. Name the opening time if walks must be clear before it.
  5. Return visits. After the City plows the adjacent street, reopen ramps, crosswalks and any sidewalk the plow covered.
  6. Ice. Require ice checks after melt and refreeze, and name the treatment, whether sand, deicer or both, with application limits.
  7. Records. Time-stamped photos or logs showing arrival, completion and treatment for each visit.

Here's how those terms play out in common storm patterns:

Storm patternWhat the contract should require
Overnight snow ends before 5 a.m.Walks and ramps clear before opening, done alongside the lot plow
Daytime snow ends mid-morningCrew on site soon after the stop; entrances first, full frontage well inside the window
Long daytime stormPassable walks during business hours, then a full clear after it stops
Snow ends late afternoonFull clear that evening so slush doesn't freeze into ice overnight
City plows the street after you've clearedReturn visit to reopen ramps, crosswalks and sidewalk the plow covered
Clear skies, refreeze overnightIce check and treatment before opening

Sample sidewalk clause

Adapt this to your site and have your attorney review it with the rest of the contract:

Contractor shall clear all public sidewalks, curb ramps, crosswalks to the street gutter and unsheltered bus stop paths shown on the site map to bare pavement, full width, within [X] hours after snowfall stops and in all cases within the time required by Minneapolis ordinance. When snow stops between [time] and [time], walks shall be clear by [opening time]. Contractor shall return within [X] hours after the City plows any adjacent street to reopen ramps, crosswalks and sidewalk sections covered by the plow. Snow shall be placed only in marked boulevard or on-site areas and never in a street or alley. Contractor shall log arrival and completion times and photograph each frontage on every visit.

Sidewalk crews are usually priced separately from plow trucks. Our page on sidewalk and entrance clearing explains how that service is typically scoped, and our snow removal contract checklist covers the rest of the agreement.

Minneapolis sidewalk compliance checklist

Use this list before the season and after every snowfall. It turns the City's rule into something a site manager can check.

Before the season

  • Measure every public sidewalk frontage, and list corner ramps, crosswalks and unsheltered bus stops.
  • Confirm who is responsible under each lease, and that the contract names the 4-daytime-hour deadline.
  • Mark boulevard and on-site areas for sidewalk snow. Nothing goes into the street or alley.
  • Keep sand or deicer on site for touch-ups between visits.
  • Flag weekend and holiday coverage, since the City's published rule doesn't list exceptions for them.

After each snowfall

  • Note when snow stopped, and work out the deadline.
  • Confirm walks, ramps and crosswalks are clear to bare pavement along the full frontage.
  • After the City plows your street, confirm the return visit happened.
  • File photos and service times.

Running sidewalks and lots under one plan prevents gaps between crews; our winter storm checklist for property managers covers the rest of the site. A written bid from East Metro Snow Removal for a Minneapolis property spells out the sidewalk scope, completion windows and how each visit is documented, so you can check it against this list.

Frequently asked questions

Do Minneapolis businesses have to clear sidewalks on weekends and holidays?

The City's published rule defines daytime hours as 8 a.m. to 5 p.m. and doesn't list exceptions for weekends or holidays, so plan as if the clock runs every day. Make sure your contract covers Saturday, Sunday and holiday storms to the same completion standard as weekdays, since that's when in-house staff are least likely to be around.

Does the 4-hour rule apply to apartment buildings in Minneapolis?

Yes. The 24-hour deadline applies only to single-family homes and duplexes. Every other property, including apartment and condo buildings, triplexes, offices, stores, churches and industrial sites, falls under the 4-daytime-hour rule. Apartment owners should also keep paths to trash and recycling areas open so collection isn't missed.

Do I have to clear the snow pile the City plow left at my corner?

Not past the gutter. The City says owners don't have to clear snow piles left by plows beyond the gutter, though you can if it's safe, and its crews will handle them as soon as possible. You're still responsible for opening curb cutouts and crosswalks up to the gutter, which often takes a second visit after the street is plowed.

Can I use salt on a Minneapolis sidewalk?

Yes. The City's sidewalk rules name sand for packed snow or ice you can't remove, and its assessment guide mentions sand or salt on icy sidewalks. If you use salt, apply it after shoveling and sparingly, and expect plain rock salt to slow sharply when pavement is colder than about 15°F. Excess salt damages concrete and pollutes lakes and streams.

How do I report an unshoveled sidewalk in Minneapolis?

Report it online through the City's sidewalk snow and ice page or call 311, or 612-673-3000 from outside Minneapolis. 311 phone hours are 7 a.m. to 7 p.m., Monday through Friday. The City inspects, and if the sidewalk still isn't clear at a follow-up inspection, crews clear it and bill the owner.

How much does Minneapolis charge to clear a sidewalk?

The City bills the owner for the clearing, and its special assessment guide prices commercial properties higher than single-family homes, plus an administrative fee per violation. Unpaid bills are added to property taxes. Rates are updated from time to time, so call 311 for current charges before budgeting around them.

What if a tenant is supposed to shovel and doesn't?

The City still bills the property owner, because the sidewalk duty and any assessment attach to the property. Your remedy against the tenant comes from the lease. To avoid that, require tenants with snow duties to show a contract, set a completion standard that matches the 4-daytime-hour rule, and keep the right to hire your own contractor and charge them back.

Sources & further reading

Prices on this site are planning ranges, not quotes. Rules change: the city or agency page is always the authority. Nothing here is legal or insurance advice.

Free · No obligation · Commercial only

Get a written commercial snow bid

One form, one free written bid for your property. Every bid we write spells out:

  • A site mapPlow zones, stacking areas, no-stack zones and hazards, marked before the first storm.
  • Trigger depths & service levelsWhen service starts, zero-tolerance areas, and what “done” means.
  • Completion windowsTarget open-by times for lots, walks and entrances.
  • A salt & ice planPre-treat, deicer choice by pavement temperature, and re-treat rules.
  • Pricing you can compareSeasonal, per-push, per-event or hourly, priced side by side if you want.
  • DocumentationHow every visit is logged so you have a record.
Services to bid

Free and no obligation. Commercial properties only: HOAs, multifamily, retail, office, industrial, medical, churches and schools.

Get a free commercial snow bid