How Do You Run a Pre-Season Snow Site Walk?

9 min read Updated  By the East Metro Snow Removal team

Quick answer

Walk the property with your snow contractor in September or October, in daylight, before the ground freezes. Leave with four things: a marked-up site map showing plow zones, stack and no-stack areas, zero-tolerance areas, drains and hazards; dated photos of existing damage; a storm-night contact tree; and written agreement on triggers, completion times and the salt plan. Then stake curbs, islands, hydrants and drains before freeze-up.

Key takeaways

  • Schedule the site walk for September or October, with the person who will actually supervise your site in the room.
  • The snow site map is the contract's most useful exhibit: plow priorities, stack zones, no-stack zones, drains and hazards on one page.
  • Photograph curbs, islands, sod, pavement and signs before the season so spring damage claims are settled by evidence, not memory.
  • Stake curbs, island noses, hydrants, drains and irrigation heads before the ground freezes.
  • Test the storm-night contact tree in November, before the Twin Cities' normal 9.3″ November snowfall arrives.
In this guide
  1. What is a pre-season snow site walk?
  2. Pre-season site walk checklist
  3. How do you build a snow site map?
  4. How should a commercial property be staked for snow?
  5. Why photograph pre-existing damage before snow season?
  6. What does the site walk reveal that changes the price?
  7. Who belongs on the storm-night contact tree?
  8. What should be agreed in writing before the first snowfall?
  9. Month-by-month snow prep calendar: August to November
  10. Frequently asked questions

What is a pre-season snow site walk?

A pre-season snow site walk is a walkthrough of the property, done by the property manager and the snow contractor together before winter, to agree on exactly how the site will be plowed, stacked, salted and documented. It turns a contract's general language into specific decisions about specific curbs, doors and drains. It's also the best chance you'll get to fix problems while the pavement is still visible.

Who should be there:

  • The property or facility manager who will take the calls on storm nights.
  • The contractor's supervisor or route lead for your site, not only the salesperson.
  • Maintenance staff who know where the drains, irrigation heads and trouble spots are.
  • For an HOA, a board member who can approve stack zones and priorities.

The University of Minnesota's SmartWinterSalt guidance for property managers recommends the same step: meet with staff or contractors to go over site plans and snow and salt storage areas, and identify areas that can be closed off for winter. A good walk ends with a marked-up map, a photo set, a contact list and a short list of decisions to write into the agreement. Our commercial snow removal contract checklist covers where each one goes in the paperwork.

Pre-season site walk checklist

Use this checklist on the walk itself. Each row is something to look at and something to write down or mark on the map. Walk every edge of the property, not just the main lot, and do it in daylight so nothing gets missed.

ItemWhat to checkWhat to record
Entrances and exitsWidth, slope, sight lines to the streetPlow priority; no-stack corners
Drive lanes and parking rowsDead ends, tight turns, one-way flowPush direction; equipment needed
Curbs and islandsHeight, damage, noses that sit lowStake locations; existing damage photos
Sidewalks and building entriesWidth, length, doors, mats, canopiesLinear feet; hand-work areas; clear-by time
Stairs, ramps and handrailsNumber of steps, covered or exposedHand-work and deicer plan
Accessible stalls, aisles and curb rampsLocations, route to the doorPriority 1; never-stack areas
Fire lanes, hydrants and fire department connectionsMarked width, hydrant locationsNo-stack zones; clearance around hydrants
Storm drains and catch basinsLocation, grates, low spots that pondFlags on map; melt paths
Downspouts and roof drip linesDischarge onto walks; icicle zonesRefreeze watch list; reroute requests
Irrigation heads and valve boxesLocations near curbs and turf edgesStakes; damage photos
Landscaping and treesBeds, young trees, salt-sensitive plantsNo-stack and low-salt areas
Loading docks and dumpstersDoor count, approach lanes, pickup daysClear-by times; pullback needs
Speed bumps, wheel stops, bollards, signsHeight and locationStakes; hazard notes
Pavement conditionPotholes, heaved slabs, loose paversRepairs before freeze; edge type
LightingDark corners and walksRepair list; night-work hazards
Gates, codes and keysAccess after hoursCodes on the contact sheet
Parking structuresPosted clearance, rampsEquipment that fits
Snow and salt storageRoom to stack; where salt is keptStack zones; covered salt storage

FEMA's Snow Load Safety Guide adds one more item for buildings with large flat roofs: check that roof drains, gutters and downspouts are clear before the season, and decide in advance where any snow removed from the roof will be stored on the ground, away from entrances, exits and canopies. Our guide to commercial roof snow load in Minnesota explains why.

How do you build a snow site map?

Build the snow site map on an aerial photo or the property's site plan, and layer on every decision from the walk: where to plow first, where snow goes, where it never goes, and what's hidden under the snow. Keep it to one page if you can, print it large, and give a copy to every operator who works the site. Attach the final version to the contract.

The layers a complete map shows:

  • Plow zones and priorities. Number the areas in the order they get cleared. A common sequence is entrances, fire lanes and accessible routes first; main drive lanes second; parking rows third; overflow and low-use areas last.
  • Stack zones. Primary and overflow areas for piles, sized for a heavy winter, with arrows showing push direction.
  • No-stack zones. Entrances, exit corners, fire lanes, hydrants, accessible stalls and aisles, walls and storefronts, drains and landscaped beds.
  • Zero-tolerance areas. Places that must be kept clear of snow and ice throughout the event, not just after it ends, such as hospital entrances, ambulance routes and key building doors. These drive extra visits and salt, so mark only the areas that truly need it; our medical and senior living snow removal page covers how those sites set them.
  • Drains and melt paths. Catch basins, trench drains and the low spots where melt water collects.
  • Hidden hazards. Curbs, island noses, irrigation heads, speed bumps, bollards, light-pole bases and drain grates.
  • Equipment and salt. Where a loader or skid steer will be staged, and where salt is stored.

Use one consistent color code across your properties so operators read every map the same way. Our snow stacking and pile placement guide includes a color-code table you can copy, along with the rules for where piles should and shouldn't go.

How should a commercial property be staked for snow?

Stake every edge a plow can't see under snow: curbs, island noses, landscape bed edges, hydrants, drains, irrigation heads, speed bumps, fences and the edges of walks that meet turf. Stakes are cheap; a broken curb, a cracked irrigation head or a gouged lawn in April is not. The stakes have to go in before the ground freezes, so schedule them for October or early November.

Practical staking rules:

  • Use tall, flexible plow stakes with reflective tops so they show above deep snow and in headlights.
  • Put stakes on the side of the hazard the plow approaches from, a short distance back from the edge, so the operator knows to slow down before contact.
  • Stake more tightly on curves, island noses and anywhere the curb is low or broken.
  • Use a different stake color, or a flag, for hydrants and drains so operators know they mark a no-stack spot, not just an edge.
  • Record which party installs, maintains and removes the stakes, and when they come out in spring.

Stakes get knocked over during the season. Ask the contractor to check and reset them during routine visits, and note missing stakes in the service log so you know where damage risk went up.

Why photograph pre-existing damage before snow season?

Photograph pre-existing damage so that spring damage claims are settled with evidence instead of memory. Curbs get chipped, sod gets scalped and irrigation heads get snapped every winter, and without dated photos nobody can prove whether it happened this season or three seasons ago. Both the property and the contractor benefit from a shared, dated record.

What to photograph:

  1. Every curb run and island nose, especially ones already chipped or cracked.
  2. Sod edges along drive lanes and walks.
  3. Irrigation heads, valve boxes and landscape lighting near pavement.
  4. Pavement cracks, potholes, heaved slabs and loose pavers.
  5. Light-pole bases, bollards, signs and wheel stops.
  6. Building corners, overhead doors, dock bumpers and storefront glass near plowed areas.
  7. Fences, gates and dumpster enclosures.

Take the photos with date and location data turned on, store them in a shared folder both parties can see, and have both sides acknowledge the set in writing. Repeat the same walk in spring to compare. Our guide to snow removal documentation and service logs covers how to keep records through the season, from storm logs to salt use.

What does the site walk reveal that changes the price?

The site walk reveals the details that make two lots of the same size cost different amounts to service: hand work, layout, storage room and service expectations. That's why a bid priced from an aerial photo alone is a guess. Walking the site lets the contractor price what's actually there, and lets you see which of your own requirements are driving the number.

The findings that move a bid most:

  • Sidewalk linear feet, stairs and ramps. Hand work is slow and labor-heavy, and it's often the longest part of a visit. Measure it on the walk.
  • Layout. Islands, dead-end rows, tight corners and loading docks add equipment time and may require a skid steer as well as a truck.
  • Zero-tolerance areas. Each one adds visits and salt during the storm, not just after it.
  • Completion window. "Open by 6 a.m." costs more than "within 4 hours after snow stops," because it requires more equipment at the same moment.
  • Snow storage. A lot with no room to stack will need relocation or hauling, which is priced separately.
  • Salt needs. Shaded areas, slopes and downspouts that drain across pavement need more ice management.

Legal deadlines can set the completion window for you. Minneapolis requires businesses and apartments to clear public sidewalks within 4 daytime hours after snow stops, and St. Paul requires sidewalks cleared within 24 hours, full width, down to bare pavement. Our guide to commercial snow removal cost in the Twin Cities shows how these drivers turn into planning ranges.

Who belongs on the storm-night contact tree?

The storm-night contact tree should name everyone who makes or carries out a decision when it snows at 2 a.m., with a phone number that's answered at 2 a.m. That usually means the property manager, an after-hours backup, the contractor's dispatcher and site supervisor, and whoever controls building access. Test it before the first storm, not during it.

RoleTypical personCall them when
Primary property contactProperty or facility managerService questions, extra work approval, complaints
After-hours backupAssistant manager or on-call maintenancePrimary contact can't be reached
Contractor dispatchContractor's dispatcher or ownerService hasn't started or finished on time
Site supervisorContractor's route lead for your siteSpecific problems on the lot or walks
Building accessSecurity, alarm company or building engineerGates, codes, loading doors, garage access
Tenant or resident leadsStore managers, HOA board, building captainsEarly openings, moved cars, complaints

Write down who can authorize extra work, such as hauling, relocation or extra salting, and the dollar limit they can approve without a second sign-off. Write down how the contractor confirms service is done, whether by text, email or an app. And set an escalation rule, such as calling dispatch if entries aren't clear 30 minutes past the agreed completion time.

What should be agreed in writing before the first snowfall?

Before the first snowfall, the property and contractor should have in writing every decision the site walk produced, plus the service terms that depend on them. Verbal agreements made on a sunny September afternoon are forgotten by the January storm. The essentials:

  • Trigger depth, the snowfall amount that starts service, for lots and for walks separately. See snow trigger depths and service levels.
  • Completion windows, such as entries and walks clear by 6 a.m. and the lot by 7 a.m., with what happens if snow is still falling.
  • Zero-tolerance areas and how often they're checked during an event.
  • Salt and ice plan: when the contractor pre-treats, salts and returns for refreeze patrols, which deicers are used where, and how pavement temperature drives the choice.
  • Stack zones, relocation and hauling: triggers, who authorizes, and rates.
  • Documentation: what's recorded each visit, such as times, snow depth, salt used and photos.
  • Damage reporting: how damage is reported, by when, and how it's repaired.
  • Insurance: a certificate naming the property where required. See snow contractor insurance requirements.

These are the same items a written bid from East Metro Snow Removal spells out, along with the site map and the pricing structure, so the walk and the bid can be reconciled line by line.

Month-by-month snow prep calendar: August to November

Snow prep runs from August, when budgets and contracts get started, through November, when the Twin Cities' first real snow usually arrives. MN DNR normals for MSP show 0.6 inches of snow in October and 9.3 inches in November, so plan for the first plowable storm to come in November and have everything in place before then.

MonthProperty managerWith the contractor
AugustReview last season's logs, invoices and damage; set the budget; send the RFP or renewal requestRequest bids; ask for equipment and route details
SeptemberCompare bids side by side; check references and insurance; choose a contractorSchedule and hold site walks; draft the site map
OctoberSign the contract; repair potholes, curbs and trip hazards; clean drains, gutters and downspoutsFinalize the site map; photograph existing damage; install stakes
NovemberTest the contact tree; notify tenants or residents of snow rules; stock ice melt and entry mats for staffConfirm trigger, completion windows and salt plan; first pre-treat and first push

Two timing notes. First, many contractors set their routes in late summer and early fall, so properties that wait until November may have fewer choices; our guide on when to sign a snow removal contract covers the timing in detail. Second, stakes and repairs depend on unfrozen ground, so October is the deadline for anything that goes into the soil.

Frequently asked questions

When should the pre-season snow site walk happen?

September or October is the sweet spot. That's late enough for the contract to be decided or close to it, and early enough to repair hazards, finalize the site map and install stakes before the ground freezes. Walking in daylight matters, so schedule it for a weekday morning or early afternoon.

Should the contractor or the property make the snow site map?

Usually the contractor drafts it, because it reflects their equipment and plowing plan, and the property reviews and approves it. The property should insist on its own priorities, such as no-stack areas, zero-tolerance entries and protected landscaping. The final version should be signed off by both sides and attached to the contract.

Do we need a new site walk every year?

Yes, even with the same contractor. Operators change, tenants move, curbs get rebuilt and new hazards appear. A shorter annual walk confirms the existing map, updates anything that changed and refreshes the damage photos. A full walk makes sense whenever the contractor, the layout or the service level changes.

What if the contractor's operators change mid-season?

That's why the site map and stakes exist. A new operator should get the printed or digital map before their first visit, and the contractor's supervisor should walk them through the site's no-stack zones and hazards. Ask the contractor how they brief replacement operators, and note any change in the service log.

Who removes the plow stakes in spring?

Whoever the contract says. Most often the contractor installs and removes them, and the removal date is set after the last likely snowfall, which in the Twin Cities can be in April. If stakes are left in, they can get hit by mowers and become a trip hazard, so put the responsibility and timing in writing.

What problems should we fix before the first snowfall?

Fix anything a plow could catch or that makes ice worse: potholes, heaved slabs, loose pavers, broken curbs, downspouts that drain across walks, clogged catch basins and burned-out lot lights. These are cheaper to repair in October than to work around all winter, and each one makes snow and ice harder to manage safely.

Sources & further reading

Prices on this site are planning ranges, not quotes. Rules change: the city or agency page is always the authority. Nothing here is legal or insurance advice.

Free · No obligation · Commercial only

Get a written commercial snow bid

One form, one free written bid for your property. Every bid we write spells out:

  • A site mapPlow zones, stacking areas, no-stack zones and hazards, marked before the first storm.
  • Trigger depths & service levelsWhen service starts, zero-tolerance areas, and what “done” means.
  • Completion windowsTarget open-by times for lots, walks and entrances.
  • A salt & ice planPre-treat, deicer choice by pavement temperature, and re-treat rules.
  • Pricing you can compareSeasonal, per-push, per-event or hourly, priced side by side if you want.
  • DocumentationHow every visit is logged so you have a record.